What details should be paid attention to in indoor

2022-07-22
  • Detail

The acceptance of home decoration is generally divided into five aspects (water, electricity, tiles, wood and oil). The acceptance of all aspects of the project is based on the national acceptance specifications and the quality acceptance standards agreed in the construction contract. As the owner's non professional acceptance, the following points should be paid attention to: first, water: pool, basin, sanitary ware, upper and lower water pipes, heating, etc. Check: whether the installation of the pool, basin and sanitary ware is flat, firm and straight; Whether the upper and lower water pipelines are straight, whether the fasteners have been installed, and whether they are connected

the acceptance of home decoration is generally divided into five aspects (water, electricity, tile, wood and oil). The acceptance of all aspects of the project is based on the national acceptance specifications and the quality acceptance standards agreed in the construction contract. As the owner's non professional acceptance, the following points should be paid attention to:

I. water: pool, basin, sanitary ware, upper and lower water pipes, heating, etc

check whether the installation of pool, basin and sanitary ware is flat, firm and straight; Whether the upper and lower water pipelines are straight, whether the fasteners have been installed, and whether the joints have water leakage and seepage

II. Electricity: power cord (socket, switch, lamp), TV, telephone

check: whether the power line uses national standard copper wire, and 2.5 square wires are used for general lighting and sockets; The kitchen and bathroom use 4 square wires. If the power line is multi stranded, it can be connected to the switch socket after soldering; TV and telephone signal lines should be kept at a certain distance from the power line (not less than 250mm). Metal lifting points should be used for the installation of lamps and lanterns, and they should be tested one by one after completion

III. tiles: ceramic tiles (wet paste, dry paste), stone (wet paste, dry hang)

see: before construction, the pre arrangement and pre selection process should be carried out. The materials with different specifications should be divided into several categories and placed in different rooms or planes to align the bricks. The materials with individual corners should be used as cutting materials, so that the materials with lower quality can be used to achieve better results

IV. wood: doors and windows, ceiling, wall cabinet, dado, heating cover, floor

look: when choosing wood, you must choose the drying material, so as to avoid future deformation; Wood should be painted with fire-proof and anti-corrosion materials on the static surface before use, and blockboard should be made of high-quality and environmental friendly materials. There shall be no less than 8 fixed points per square meter for large-area ceiling and dado. Metal hanging points shall be used for the ceiling, and better materials shall be used for the fabrication of doors and windows to prevent deformation. The wood square of the floor leveling should be larger (no less than 6 × 6)

v. oil: paint (clear oil, mixed oil), coating, pasting, soft package

look: the surface treatment of decoration is the most critical. High quality materials must be used for paint. Surface treatment must be done before painting or painting. The atomic ash should be hung on the surface of wood before mixing oil, and then the paint should be sprayed after grinding and leveling. Before painting the wall paint on the wall, primer (to isolate the acid-base reaction of the wall and finish paint) must be used to prevent the wall from discoloration